ABOUT US

Contact us
Tel:0086-0512-57627658

Phone:0086-13962686595

Fax:0086-0512-57627699

E-mail:boercap001@163.com

Address: No. 31, Lu Yang Youyi South Road, Zhou Shi Town, Kunshan City,Jiangsu Province, P.R.China

Current location:Home > development path
development path
Company Growth Memorabilia

KunShan BOERCAP plastic products co., LTD  was founded in October 2002, is committed to serving the domestic and international plastic, metal, glass, and so on packaging containers of the packaging industry
October 2009 to become Suzhou City in 2009 the first batch of private technology enterprises in Jiangsu Province.
November 23, 2009, the company ordered two new, for the professional system Gay type injection molding machine to the factory.
April 30, 2010, cold water system renovation update, the new machine to the factory installation.
On May 18, 2010, the new installation of the second cold water system in 2010 was completed and put into use.
June 29, 2010, the rapid pad into the cover production line installation is completed and put into use.

September 8, 2010, successfully selected as a national Chinese credit enterprise (CCECA), China's credit enterprise certification system demonstration units. Internet News Center Internet Credit Office.September 29, 2010, the company re-ordered two, the control system by the optimal design, professional for the system of special injection molding machine to the factory.

November 15, 2010, Li was invited to China Petrochemical Co., Ltd. Great Wall Lubricant Corporation, to participate in the China Petroleum and Chemical Industry Co., Ltd. annual event, and received a warm recognition.

December 21, 2010, the company arranged technical personnel to the factory inspection equipment.
January 6, 2011, after the inspection of qualified injection molding machine to the factory, and installed, put into production.
January 18, 2011, the company's management research decision, in 2011 to draw a special funds for the development of cutting series of new anti-theft caps.
January 21, 2011, the technical staff to Zhangjiagang responsible for the development of cutting equipment companies to negotiate and reach a contract.
April 22, 2011, the technical staff to Zhangjiagang site acceptance and improve the views.
May 19, 2011, the third 40 mm fast pad into the cover production line installation is completed and put into use. The use of this machine will enable us to increase production capacity of more than 20%, and quality control to be further strengthened.
June 22, 2011, fast cutting flap assembly line installation is completed and put into use. Marking the new series of products will be officially on the line.
June 22, 2011, the cover of the product leak detector to the factory to complete and put into use.
August 11, 2011, the fourth 50 mm fast punch into the cover production line installation is completed and put into use.
November 18, 2011, 49mm screw cap, pad into the cover production line is installed and put into use.
December 28, 2011, the company successfully marked in the Lu Yang Friendship Road 31, a piece of land for the future development of the company reserve space.
July 12, 2012, the assembly line was completed and installed, and officially put into production.
July 22, 2012, Jiangsu Province, the quality inspection department of the Secretary for food production license certification audit.
July 24, 2012, injection molding production line began to move, on August 8 installation is completed, and formally put into production.
August 6, 2012, mold manufacturing department began to move, on August 10 installation is completed, and officially put into production.
August 15, 2012 at 8:18 pm, in this festive moment, the company gathered all the staff of the new site, a grand celebration of the company opening ceremony.
October 28, 2012, the company re-ordered two, the control system by the optimal design, professional for the system-type special injection molding machine.
January 3, 2013, the custom system of Gat-type injection molding machine two, arrived at the Division I and installed into production, a greater degree of ease of production pressure.
January 4, 2013, with an automated machinery company in Tianjin signed a contract to produce P2 and SPC series assembly machine.
March 12, 2013, the company re-ordered two, control and power system by the optimal design, professional for the system-type special injection molding machine.
March 29, 2013, and Shanghai, an automated machinery company to work together to produce SC63 / 30LI series assembly machine delivery and commissioning production.
December 12, 2013, ordered two, professional for the system Giant type injection molding machine to the factory installation and commissioning successful production.
April 16, 2014, the world's number one industrial packaging multinational group Cui Sul (tri-sure) Sealing System Co., Ltd., to our office.
June 22, 2014, SC45 / 24 I 16 cavity new bottle caps trial success, not only for the Division I caps the collective added a new bright spot, but also once again proved our division of the mold manufacturing industry on a new level, I Secretary of the production capacity to further enhance.
January 15, 2015, SC38 / 23LI-SL new bottle cap successful trial, for the Division I caps the collective added a new bright spot, but also for the company's growth, adding a new power source
June 15, 2015, SC47 / 22LI-SL new bottle cap success
 
June 25, 2015, SC47 / 22LI-SL officially put into production
October 16, 2015, SC32 / 19 caps officially put into production
February 18, 2016, the company re-ordered a large tonnage, specializing in the system for the special type of injection molding machine.
March 10, 2017, the company re-ordered two, professional for high-speed system of injection molding special machine.